In 2011 one of the RPCC priorities selected by the membership was the installation of sidewalks along Racine to make the walk to and from school safer for the Rolando Park Elementary students who traveled along that route.
The dialogue between RPCC and the City resulted in happy results when sidewalks along both Racine Road and College Grove Drive were completed in the summer of 2014.